首页> 外文期刊>International Journal of Production Research >Integrated production, distribution and scheduling in the aluminium industry: a continuous-time MILP model and decomposition method
【24h】

Integrated production, distribution and scheduling in the aluminium industry: a continuous-time MILP model and decomposition method

机译:铝工业中的集成生产,分销和调度:连续时间MILP模型和分解方法

获取原文
获取原文并翻译 | 示例
       

摘要

This article deals with the multi-stage production-shipping and distribution-scheduling problem in the aluminium industry. Related processes take place in worldwide operating networks with multiple sites in each stage. The aim is to coordinate production activities and material flows worldwide months in advance and exactly to the day, so that temporary storage of intermediate products is reduced network wide or even set to zero. This paper includes a further development of the multi-stage production-shipping and distribution-scheduling problem including in-time supplies of all production sites (MSPSDS-IS). However, the in-time supplies at the sites often result in network-wide temporary storage before and/or after site production. In contrast, it should be possible that either stock-free material flows within the entire network or site-specific storage times are prescribed. The previous modelling is not able to meet these aforementioned requirements as it can be considered as special case of the generalised approach developed in the following. Therefore, a substantially extended continuous-time MILP model is presented. Furthermore, extensive computational experiments with a high-performance computer indicate that a modified version of the relax-and-fix heuristic, which was applicable to the MSPSDS-IS, also results in high-quality solutions and remarkable reductions in computation times.
机译:本文讨论了铝行业中的多阶段生产运输和分销计划问题。相关过程在全球运营网络中进行,每个阶段都有多个站点。目的是在全球范围内提前几个月准确地协调生产活动和物料流,直到一天,以便中间产品的临时存储在整个网络范围内减少,甚至设置为零。本文包括多阶段生产运输和分配计划问题的进一步发展,包括所有生产站点的及时供应(MSPSDS-IS)。但是,现场的及时供应通常会在现场生产之前和/或之后导致网络范围内的临时存储。相反,应该有可能规定整个网络中无库存的物料流或特定于站点的存储时间。先前的建模无法满足这些前述要求,因为它可以被视为下文中开发的通用方法的特殊情况。因此,提出了一个大大扩展的连续时间MILP模型。此外,使用高性能计算机进行的大量计算实验表明,适用于MSPSDS-IS的松弛和固定启发式算法的修改版本也可以提供高质量的解决方案,并显着减少计算时间。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号