首页> 外文期刊>International Journal of Production Research >Lean manufacturing tool in engineer-to-order environment: Project cost deployment
【24h】

Lean manufacturing tool in engineer-to-order environment: Project cost deployment

机译:按订单设计环境中的精益制造工具:项目成本部署

获取原文
获取原文并翻译 | 示例
       

摘要

The present paper proposes a modified version of the Manufacturing cost deployment (MCD) method to analyse engineer-to-order (ETO) production systems. The novel approach, named Project cost deployment (PCD), introduces two substantial and innovative modifications. To begin with, the concept of manual assembly macro-activity replaces the traditional concept of station. Then, a brand-new structure for classifying and analysing losses is introduced, that is specifically defined to deal with the inefficiencies of the manual assembly tasks. The validity of the approach is proved by a real-world industrial application. The obtained results demonstrate that the PCD method allows the analyst to identify the hidden losses and to quantify the wastes from an economical point of view. In addition, PCD permits to estimate the impacts of potential (lean) improvement activities and projects in terms of both efficiency and effectiveness.
机译:本文提出了制造成本部署(MCD)方法的修改版本,以分析按订单生产(ETO)的生产系统。名为项目成本部署(PCD)的新颖方法引入了两项实质性和创新性的修改。首先,手动装配宏活动的概念取代了传统的工位概念。然后,引入了一种用于分类和分析损失的全新结构,该结构专门定义为处理手动组装任务的低效率。该方法的有效性已通过实际工业应用证明。获得的结果表明,从经济的角度出发,PCD方法使分析人员能够识别隐藏的损失并量化废物。另外,PCD允许从效率和有效性方面评估潜在(精益)改进活动和项目的影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号