...
首页> 外文期刊>International journal of production economics >The capacitated multi-level lot-sizing problem with distributed agents
【24h】

The capacitated multi-level lot-sizing problem with distributed agents

机译:具有分布式代理的电容多级批量尺寸问题

获取原文
获取原文并翻译 | 示例

摘要

Cloud manufacturing is an emerging concept that enables the orchestration, matching, and sharing of services or resources among collaboration partners or intra-plant facilities. In this context, we introduce the capacitated multi-level lot sizing problem with transshipments and set up carry-over. We consider components that can only be produced by one specific agent as well as components that can be provided by more than one producer. As capacities are limited, agents might have to share resources and jointly cover required demands. In this case, finished components are transshipped between agents. As an agent can be in charge of producing more than one component, we include the concept of set up carry-over into our modeling. We address a centralized planning approach, where the objective is to find a globally optimized lot sizing plan for all participating agents. Thus, we cover both horizontal and vertical collaboration between agents. The new problem class is formulated mathematically. We propose a matheuristic solution approach based on a fix-and-optimize procedure, where the interrelatedness of decision variables is taken into account. We benchmark the proposed approached against optimal or proven near-optimal solutions. Additionally, a decentralized upstream lot-shifting heuristic is generated, which allows us to compare the results to situations in which no central decision maker is present. Both solution approaches are applied to an extensive set of test instances. We show that the centralized approach is able to reduce the total cost by up to 47%. We assess the different levels of interrelatedness of the decision variables and demonstrate that an increase in interrelatedness can even lead to a decrease in the solution quality. Moreover, we provide valuable managerial insights into the impact of the bill-of-material structure on problem complexity.
机译:云制造是一种新兴的概念,可以在协作合作伙伴或植物内设施之间进行编排,匹配和分享服务或资源。在这种情况下,我们介绍了Transhuprupments的电容多级批量尺寸问题并设置了随身携带。我们考虑只能由一个特定代理商生产的组件以及可以由多个生产者提供的组件。随着能力有限的,代理商可能必须共享资源并共同涵盖所需的要求。在这种情况下,成品组件在代理之间传输。由于代理商可以负责产生多个组件,我们包括设置携带的概念进入我们的建模。我们满足了集中规划方法,目标是找到所有参与代理商的全球优化的批量规范。因此,我们涵盖了代理之间的水平和垂直协作。新问题类是在数学上制定的。我们提出了一种基于修复和优化程序的数学型解决方法,其中考虑了决策变量的相互关联。我们将建议的建议进行基准,反对最佳或经过验证的近最佳解决方案。此外,生成了分散的上游批量转移启发式,这使我们能够将结果与存在的情况进行比较,其中没有存在中枢决策者。两种解决方案方法都应用于广泛的测试实例。我们表明集中方法能够将总成本降低至47%。我们评估决策变量的不同级别,并证明相互关联的增加甚至可以降低溶液质量。此外,我们提供了有价值的管理洞察力对物质结构对问题复杂性的影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号