An Alternate Solution Approach towards the Time-Cost Tradeoff Problem on Activity-On-Arc Project Network

机译:弧上活动项目网络上时间成本权衡问题的替代解决方案

获取原文
获取原文并翻译 | 示例
           

摘要

Time-cost tradeoff toward optimal project crashing strategy is one of the widely discussed topics in project management. In this paper, we first present an LP formulation to accommodate the discrete and fluctuating activity crash cost using piecewise linear approximation on the AOA (Activity-On-Arc) project network. We then develop a technique to transform such LP formulation into an equivalent problem which can be easily and directly constructed, and efficiently solved. Furthermore, the decision variables in the final solution of this transformed problem have meaningful interpretations towards the desired optimal crashing strategy. It can be inferred that such transformation technique is more efficient when the project contains high number of activities with activities having large number of time units that can be crashed.
机译:时间成本与最佳项目崩溃策略之间的权衡是项目管理中广泛讨论的主题之一。在本文中,我们首先在AOA(Activity-On-Arc)项目网络上使用分段线性逼近,提出一种LP公式,以适应离散和波动的活动崩溃成本。然后,我们开发了一种技术,可以将这种LP配方转化为一个等效问题,可以轻松而直接地构建它,并有效地解决它。此外,此变换问题的最终解决方案中的决策变量对所需的最佳崩溃策略具有有意义的解释。可以推断出,当项目包含大量活动而活动具有大量可能崩溃的时间单位时,这种转换技术会更有效。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号