首页> 外文期刊>International journal of multicriteria decision making >An interactive method for the bi-objective resource-constrained project scheduling
【24h】

An interactive method for the bi-objective resource-constrained project scheduling

机译:一种双目标资源受限项目调度的交互式方法

获取原文
获取原文并翻译 | 示例
       

摘要

In this paper, we propose an interactive method to solve a bi-objective resource-constrained project scheduling problem. The method is based on a double tabu search technique and generates a representative set of potentially efficient solutions to be considered in the scheduling of operations. The method proceeds in two steps. In the first step, the tabu mode, provides a good assignment of resources; in the second step, the tabu floating task, reschedules the tasks to obtain efficient solutions with regards the considered criteria. The approach is tested on a sample of problems ranging in size from 5 to 250 tasks and compared to other methods in the literature. The comparison shows the performance of the proposed approach.
机译:在本文中,我们提出了一种交互式方法来解决双目标资源受限的项目调度问题。该方法基于双重禁忌搜索技术,并生成一组潜在的有效解决方案的代表,以在操作调度中加以考虑。该方法分两个步骤进行。第一步,禁忌模式提供了良好的资源分配;在第二步中,禁忌浮动任务重新安排了任务的时间,以根据考虑的标准获得有效的解决方案。该方法已在5到250个任务的问题样本中进行了测试,并与文献中的其他方法进行了比较。比较显示了所提出方法的性能。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号