...
首页> 外文期刊>International Journal of Mining, Reclamation and Environment >Oil sands mine planning and waste management using mixed integer goal programming
【24h】

Oil sands mine planning and waste management using mixed integer goal programming

机译:使用混合整数目标规划的油砂矿山规划和废物管理

获取原文
获取原文并翻译 | 示例
           

摘要

Strategic mine planning and waste management are an important aspect of surface mining operations. Recent environmental and regulatory requirements make waste management an integral part of mine planning in the oil sands industry. The research problem here is determining the order of extraction of ore, dyke material and waste to be removed from a predefined ultimate pit limit over the mine life that maximises the net present value of the operation. We have developed, implemented, and tested a proposed mixed integer goal programming theoretical framework for oil sands open pit production scheduling with multiple material types. The formulation uses binary integer variables to control mining precedence and continuous variables to control mining of ore and dyke material. There are also goal deviational variables and penalty costs and priorities that must be set up by the planner. The optimisation model was implemented in TOMLAB/CPLEX environment. The developed model proved to be able to generate a uniform schedule for ore and dyke material. This is in line with recent regulatory requirements by Alberta Energy Resources and Conservation Board (Directive 074) which requires oil sands mining companies to develop life of mine plans which ties in to their in-pit tailings disposal strategy. It also provides a practical mining sequence that is consistent with mining oil sands deposit. Similarly, tradeoffs between achieving a goal and maximising NPV can be made.
机译:战略性矿山规划和废物管理是露天采矿作业的重要方面。最近的环境和法规要求使废物管理成为油砂行业矿山规划不可或缺的一部分。此处的研究问题是确定在矿山寿命期间从预定义的最终矿山极限中去除的矿石,堤坝材料和废物的提取顺序,从而最大程度地提高运营的净现值。我们已经开发,实施和测试了针对多种材料类型的油砂露天开采调度的混合整数目标规划理论框架。该公式使用二进制整数变量来控制开采优先级,并使用连续变量来控制矿石和堤坝材料的开采。规划者还必须设置目标偏差变量,惩罚成本和优先级。优化模型是在TOMLAB / CPLEX环境中实现的。事实证明,开发的模型能够为矿石和堤坝材料生成统一的时间表。这符合艾伯塔省能源资源与保护委员会的最新法规要求(第074号指令),该要求要求油砂开采公司制定与他们的矿山尾矿处置策略相关的矿山计划寿命。它还提供了与开采油砂矿床一致的实用开采程序。类似地,可以在实现目标和最大化NPV之间进行权衡。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号