首页> 外文期刊>Journal of environment informatics >Mixed Integer Linear Programming for Oil Sands Production Planning and Tailings Management
【24h】

Mixed Integer Linear Programming for Oil Sands Production Planning and Tailings Management

机译:油砂生产计划和尾矿管理的混合整数线性规划

获取原文
获取原文并翻译 | 示例

摘要

In oil sands open-pit mining, further processing of the extracted oil sands generates massive volumes of tailings. To save space, the tailings are deposited in in-pit tailings containments constructed by internal dykes using mine waste material. In this paper, an integrated mine planning framework is proposed and implemented using mixed-integer linear programming to optimize the production schedule with respect to dyke construction and in-pit tailings deposition. A case study is carried out to verify the performance of the proposed optimization model. The results demonstrate how the produced tailings are deposited in the excavated mining pits as the mining operation proceeds and the in-pit dykes are constructed using mine waste material. The framework facilitates sustainable oil sands mining through a reduced environmental footprint.
机译:在油砂露天开采中,提取的油砂的进一步加工会产生大量的尾矿。为了节省空间,将尾矿存放在由内部堤坝利用矿山废料建造的井内尾矿围堵中。本文提出了一个综合的矿山规划框架,并使用混合整数线性规划来实施,以优化有关堤坝建设和矿井内尾矿沉积的生产计划。进行了案例研究,以验证所提出的优化模型的性能。结果表明,随着采矿作业的进行,产生的尾矿如何沉积在开挖的矿坑中,并利用矿山的废料建造了堤内堤防。该框架通过减少环境足迹促进了可持续的油砂开采。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号