首页> 外文期刊>International journal of mathematics in operational research >Simulated annealing approach to solve dual resource constrained job shop scheduling problems: layout impact analysis on solution quality
【24h】

Simulated annealing approach to solve dual resource constrained job shop scheduling problems: layout impact analysis on solution quality

机译:模拟退火方法解决双重资源受限的车间调度问题:布局对解决方案质量的影响分析

获取原文
获取原文并翻译 | 示例
           

摘要

Real-world manufacturing systems are operating subject to a substantial level of resource constraints. One characteristic model that considers the combination of human and machine resource constraints is called dual resource constrained (DRC). In this context a number of machines n_(mach) is managed by a selection of operators n_(op), with typically n_(op) ≤ n_(mach.). A real life case study for an Italian manufacturing company is introduced that uses a set of identical parallel machines being operated by a set of operators. Each job is scheduled to one machine with corresponding loading and unloading process times. A simulated annealing approach is proposed to solve the DRC job shop scheduling problem. A sensitivity analysis is conducted for a selection of algorithm-specific parameters used to solve characteristic DRC layouts. Being characteristic for the just-in-time (JIT) production environment, the high variability in job times has also been taken into account. The results show that the selected layout n_(mach.)_(op) ratio strongly influences the production system performance. The impact of the ratio of constrained resources has been analysed for different layouts, showing that simulated annealing performs better for single resource constrained problems while also demonstrating that this trend is not symmetrical for different layouts, either operator or machine constrained.
机译:现实世界中的制造系统在运行时会受到大量资源限制。考虑人力资源和机器资源约束的组合的一种特征模型称为双重资源约束(DRC)。在这种情况下,许多机器n_(mach)由操作员n_(op)的选择来管理,通常n_(op)≤n_(mach。)。介绍了一家意大利制造公司的真实案例研究,该研究使用一组由一组操作员操作的相同并行机。将每个作业安排到一台机器上,并具有相应的加载和卸载过程时间。提出了一种模拟退火方法来解决DRC作业车间调度问题。进行敏感性分析以选择用于解决特征DRC布局的特定于算法的参数。作为实时(JIT)生产环境的特征,还考虑了作业时间的高度可变性。结果表明,选择的布局n_(mach。)/ n_(op)比率会严重影响生产系统的性能。已针对不同布局分析了受限资源比率的影响,表明模拟退火对于单个资源受限问题表现更好,同时也表明此趋势对于操作员或机器受限的不同布局都不对称。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号