首页> 外文期刊>International journal of management science and engineering management >A multi-objective stochastic programming model for project-oriented human-resource management optimization
【24h】

A multi-objective stochastic programming model for project-oriented human-resource management optimization

机译:面向项目的人力资源管理优化的多目标随机规划模型

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

Human resource policy is one of the key factors in managing a project. The cost associated with the individuals assigned to a project and the quality of the tasks completed by the assigned individuals are two of the main concerns in developing a project team. In this study, we present a new multi-objective mathematical model for developing a project team for multi-disciplinary projects under uncertainty. The objective functions optimize cost and competency simultaneously. To cope with the uncertainty and the multiple objectives in the presented model, we applied the two-stage stochastic programming approach and the Augmented Epsilon Constraint Method, respectively. The presented model and its solution methodology can be applied to different types of projects. In this study, a project that involves an overhaul of a set of aircrafts is presented as a case study.
机译:人力资源政策是管理项目的关键因素之一。与分配给项目的个人相关的成本以及由分配的个人完成的任务的质量是开发项目团队的两个主要问题。在这项研究中,我们提出了一个新的多目标数学模型,用于在不确定性下建立一个针对多学科项目的项目团队。目标函数同时优化成本和能力。为了解决模型中的不确定性和多重目标,我们分别采用了两阶段随机规划方法和增强Epsilon约束方法。提出的模型及其解决方案方法可以应用于不同类型的项目。在本研究中,作为一个案例研究,提出了一个涉及对飞机进行大修的项目。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号