...
首页> 外文期刊>International journal of law in the built environment >Identification of the relations between dispute factors and dispute categories in construction projects
【24h】

Identification of the relations between dispute factors and dispute categories in construction projects

机译:确定建设项目中争议因素与争议类别之间的关系

获取原文
获取原文并翻译 | 示例
           

摘要

Purpose - The purpose of this paper is to: distinguish dispute factors from dispute categories, terms generally used interchangeably in the literature; compose consistent and comprehensive lists of dispute factors and categories; and identify the impacts of various dispute factors through empirical analysis of the associations between dispute factors and categories. Design/methodology/approach - In total, 50 construction projects in Turkey (each with a contract amount of 1 million USD or over) were investigated and analysed employing a specially developed dispute research survey form and through interviews with the project managers. Findings - Specific suggestions have been developed for various stakeholders of construction projects, building upon the associations revealed by the correlation analysis. These suggestions relate to the following issues; for employers: contractor selection (experience and technical capability), avoiding variations and punctual instructions; for consultants: preparation of project documents;for contractors: project selection and approach to conflicts; for project managers: defining the project scope, punctual instructions and use of ADR methods; for all stakeholders: project duration, unfamiliarity with local conditions, adversarial approach in handling conflicts and communication problems. Originality/value - This paper suggests an improvement to dispute terminology by differentiating between dispute factors and categories, and identifies the relations between these factors and categories by an empirical study. The results of this research can help practitioners and academicians by providing insights on the dynamics of dispute occurrence. An increased awareness of dispute factors and their specific impacts can allow practitioners to discern and identify the associated risks and endeavour to avoid certain practices, and thus eventually contribute to reducing disputes in the construction projects.
机译:目的-本文的目的是:将争端因素与争端类别区别开来,这些术语在文献中通常可以互换使用;撰写争议因素和类别的一致而全面的清单;并通过对争议因素和类别之间的关联进行实证分析,确定各种争议因素的影响。设计/方法/方法-使用专门开发的争议研究调查表并通过与项目经理的访谈,对土耳其的50个建设项目(每个项目的合同额为100万美元或以上)进行了调查和分析。调查结果-根据相关分析揭示的关联性,为建筑项目的各个利益相关者提出了具体建议。这些建议涉及以下问题;对于雇主:承包商的选择(经验和技术能力),避免变化和准时指示;对于顾问:项目文件的准备;对于承包商:项目的选择和解决冲突的方法;对于项目经理:定义项目范围,准时指示和ADR方法的使用;对于所有利益相关者:项目期限,不熟悉当地条件,采用对抗性方法处理冲突和沟通问题。原创性/价值-本文通过区分争议因素和类别来建议对争议术语进行改进,并通过实证研究确定这些因素与类别之间的关系。这项研究的结果可以通过提供有关争议发生动态的见解来帮助从业人员和院士。对争端因素及其具体影响的认识增强,可以使从业者辨别和识别相关的风险,并努力避免某些做法,从而最终有助于减少建筑项目中的争端。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号