Design and construction of the Barra Grande hydro plant

机译:巴拉格兰德水电站的设计与施工

获取原文
获取原文并翻译 | 示例
           

摘要

The 690 MW Barra Grande hydro project, now under construction in southern Brazil, includes a 185 m-high concrete faced rockfill dam, one of the highest of its kind in the world. Construction began in July 2001, reservoir impounding is planned in November 2004, and commercial generation is scheduled to start in October 2005. The concession for development of the Barra Grande powerplant was granted to the consortium BAESA - Barra Grande Energetica SA, an association of VBC(CPFL S/A), ALCOA, CCC and DME Energetica. Construction work at the site began in July 2001, and the project is being implemented under a turnkey contract by the UNEBAR Consortium, formed by CCC (civil works and erection), Alstom Brazil (main equipment supplies) and Engevix Engenharia S/A (engineering and substation supplies).
机译:690兆瓦的巴拉格兰德(Barra Grande)水电项目目前正在巴西南部进行建设,其中包括185 m高的混凝土面板堆石坝,这是世界上同类最高的水坝之一。建设始于2001年7月,计划于2004年11月蓄水,并计划于2005年10月开始商业发电。巴拉格兰德电厂的开发特许权已授予BAESA-巴拉德格兰德Energetica SA财团,这是VBC的一个协会(CPFL S / A),ALCOA,CCC和DME Energetica。该工地的施工工作于2001年7月开始,由CCC(土木工程和建筑),阿尔斯通巴西(主要设备供应)和Engevix Engenharia S / A(工程)组成的UNEBAR财团根据总承包合同执行该项目。和变电站用品)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号