...
首页> 外文期刊>International Journal on Hydropower & Dams >Bauer Group installs foundation for a marine powerplant
【24h】

Bauer Group installs foundation for a marine powerplant

机译:宝华集团为船舶动力装置安装基础

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

In late July, Bauer Renewables Ltd, a subsidiary of Bauer Spezialtiefbau GmbH and part of the international construction and machinery manufacturing concern Bauer AG, installed a drilled-in monopile foundation structure for a marine energy turbine for the client Voith Hydro. This took place off-shore at the test site of the European Marine Energy Centre (EMEC) in Orkney, Scotland. A challenge was posed by the drilling works at a water depth of 37 m, and also by the extremely strong currents of up to 4.5 m/s.
机译:7月下旬,Bauer Spezialtiefbau GmbH的子公司Bauer Renewables Ltd,也是国际建筑和机械制造企业Bauer AG的一部分,为客户福伊特水电安装了一种用于海洋能源涡轮机的钻孔单桩基础结构。这是在苏格兰奥克尼市欧洲海洋能源中心(EMEC)的测试现场进行的。水深为37 m的钻探工程以及高达4.5 m / s的极强水流带来了挑战。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号