...
首页> 外文期刊>International Journal on Hydropower & Dams >Turkish JV builds Fan river cascade
【24h】

Turkish JV builds Fan river cascade

机译:土耳其合资企业建立范河级联

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

A joint venture between Turkish private power producer, Ayen Enerji, and Albania's AS Energji has started preliminary construction work, on a BOT basis, of four hydro plants on the Fan river in northern Albania, which will have a total installed capacity of 110.6 MW, The 63.8 MW Ura e Fanit storage scheme and three run-of-river plants (27.9 MW Peshqesh, 12.3 MW Gojan and 6.6 MW Gjegjan) are projected to produce average annual output of 380 GWh.
机译:土耳其私营电力生产商Ayen Enerji与阿尔巴尼亚的AS Energji的合资企业已开始以BOT形式在阿尔巴尼亚北部Fan河上的四个水电站进行初步建设工作,这些水电站的总装机容量为110.6 MW,预计63.8兆瓦的Ura e Fanit储能方案和3个跨河运行的电厂(27.9兆瓦的Peshqesh,12.3兆瓦的Gojan和6.6兆瓦的Gjegjan)将产生年均380 GWh的发电量。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号