...
首页> 外文期刊>International Journal on Hydropower & Dams >Operating a hydropower cascade to optimize energy management
【24h】

Operating a hydropower cascade to optimize energy management

机译:运行水电梯级以优化能源管理

获取原文
获取原文并翻译 | 示例
           

摘要

CNR operates a cascade of 18 run-of-river hydropower plants in France. To optimize energy management, the company has implemented an innovative and integrated organization, a Centre for the Optimization and Remote Control of Intermittent Renewable Energy, with associated IT tools developed in-house for production forecasting, supervision of the hydropower assets and the optimization of electricity sales on the European wholesale electricity markets. The Centre maximizes and hedges the revenues of CNR electricity output under strict safety constraints, thus facilitating the integration of intermittent renewable energy into the European electricity markets and reducing its balancing cost.
机译:CNR在法国经营着18座梯级水电站。为了优化能源管理,该公司实施了一个创新的综合组织,即间歇性可再生能源的优化和远程控制中心,并在内部开发了用于生产预测,水电资产监管和电力优化的相关IT工具。在欧洲电力批发市场上的销售。该中心在严格的安全约束下,最大化并对冲CNR电力输出的收入,从而促进将间歇性可再生能源整合到欧洲电力市场并降低其平衡成本。

著录项

  • 来源
    《International Journal on Hydropower & Dams》 |2015年第5期|50-54|共5页
  • 作者

    V. Piron; G. Bontron; M. Pochat;

  • 作者单位

    CNR, Direction de l'Energie, 2 rue Andre Bonin, F-69316 Lyon Cedex 04, France;

    CNR, Direction de l'Energie, 2 rue Andre Bonin, F-69316 Lyon Cedex 04, France;

    CNR, Direction de l'Energie, 2 rue Andre Bonin, F-69316 Lyon Cedex 04, France;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号