首页> 外文期刊>International Journal on Hydropower & Dams >Detailed design contract awarded for Lower Kalekoey, Turkey
【24h】

Detailed design contract awarded for Lower Kalekoey, Turkey

机译:土耳其下卡莱科伊获得详细设计合同

获取原文
获取原文并翻译 | 示例
           

摘要

Poeyry has been awarded a contract by Kalehan Genc Enerji to carry out detailed design services for the 500 MW Lower Kalekoey hydropower plant and dam on the river Murat in eastern Turkey. The assignment, which is to be executed jointly with local partner Temelsu by the end of 2017, includes the execution of the detailed design for the civil engineering of the powerhouse, and structural reviews, including the RCC dam, power intake and penstocks, Piano Key Weir spillway, diversion struc- tures with two tunnels and bottom outlet, Poeyry announced on 6 June.
机译:Poeyry已获得Kalehan Genc Enerji的合同,为土耳其东部Murat河上的500 MW Lower Kalekoey水电站和大坝进行详细设计服务。这项任务将于2017年底与当地合作伙伴Temelsu共同执行,包括执行该电厂土木工程的详细设计,并进行结构审查,包括RCC大坝,进水口和压力管道,Piano Key Poeyry于6月6日宣布,堰溢洪道,带两个隧道的引水结构和底部出口。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号