首页> 外文期刊>The international journal on hydropower & dams >First refurbished unit at Dimitrie Leonida resumes operation in Romania
【24h】

First refurbished unit at Dimitrie Leonida resumes operation in Romania

机译:Dimitrie Leonida的首次翻新单位在罗马尼亚恢复运营

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

Romania's state-owned hydropower producer Hidroelectrica has announced the completion of the refurbishment and repowering of the first of six units at the 210 MW Dimitrie Leonida storage plant, on the river Bistrita in the northeastern region of Moldavia. Unit 6 was returned to commercial service on 24 March, after tests which confirmed that the unit is operating at its new design parameters of 55 MW and an installed capacity of 60.14 MVA, Hidroelectrica announced, adding that performance tests would continue throughout this year in parallel with its commercial operation.
机译:罗马尼亚国有水电生产商HIDROELERTIC宣布完成了摩尔瓦西亚东北地区的210 MW DIMITRIE LEONIDA储存厂的翻新和重新交力。 3月2日,单位6将于3月24日返回商业服务,确认该装置在其新设计参数下运行55 MW和安装量60.14 MVA的安装量,HIDROElectra宣布,补充说,今年的绩效测试将继续并行地继续凭借其商业运营。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号