...
首页> 外文期刊>The international journal on hydropower & dams >Selingue rehabilitation goes ahead in Mali
【24h】

Selingue rehabilitation goes ahead in Mali

机译:马里的Selingue修复工作继续进行

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Rehabilitation of three units at the 47.6 MW Selingue hydropower plant on the river Sankarani, a tributary of the river Niger, in Mali, is expected to start in February. The work is being financed by the West African Development Bank (BO-AD) with a loan of up to CFA 25 billion (US$ 42.5 million). A consortium of Ingerop and Artelia, contracted by the BOAD to oversee the works, expects first tests on the Voith Kaplan turbines (G1, G2 and G3) to start in February, and work on handling equipment and overhead cranes should start by the end of March. Rehabilitation work on the turbines and generators should begin in July. Civil engineering work will be carried out by the Malian construction company Somafrec. According to the contract, the work is expected to take 34 months, with completion expected by September 2022, but owing to the scale of the project, engineers expect completion to be in early 2023.
机译:位于马里尼日尔河支流Sankarani河上的47.6兆瓦Selingue水电站的三台机组的修复工作将于2月开始。西非开发银行(BO-AD)为这项工作提供了高达250亿非洲金融共同体法郎(4250万美元)的贷款。由BOAD承包的Ingerop和Artelia财团负责监督工程,预计对Voith Kaplan涡轮机(G1,G2和G3)的首次测试将于2月开始,有关搬运设备和桥式起重机的工作应于2008年底开始。游行。涡轮机和发电机的修复工作应在7月开始。土建工程将由马里建筑公司Somafrec进行。根据合同,这项工作预计需要34个月,预计将于2022年9月完成,但由于该项目的规模,工程师预计将于2023年初完成。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号