A Case Study of Probabilistic Seismic Slope Stability Analysis of Rock Fill Tailing Dam

机译:堆石尾矿坝概率性地震边坡稳定性分析实例

获取原文
获取原文并翻译 | 示例
       

摘要

The article presents the case history of expansion of rock fill tailing dam of the Rampura-Agucha zinc mine in Rajasthan, India. Before raising the height of the dam from 27 m to 54 m, a detailed seismic stability analysis was performed considering the spatial variability of the soil. The safety values and the probability of failure were calculated using the Monte Carlo simulation method. All the analyses were carried in a 2-D limit equilibrium-based SLIDE software using Spencer's method. The cohesive strength (c), the angle of friction and the acceleration due to earthquakes were considered as the random variable. The final slope geometry was created after the seismic stability analysis of the upstream and downstream slopes. For the critical geometry of the slope, the observed factor of safety values was found to be higher than the values specified in the ANCOLD. The probability of failure value was found to be less than 8%. The newly constructed rock fill dam has already sustained three Monsoon rains and still continues to be performing at its best condition.
机译:本文介绍了印度拉贾斯坦邦Rampura-Agucha锌矿的堆石尾矿坝扩展的案例历史。在将大坝的高度从27 m提高到54 m之前,考虑了土壤的空间变异性,进行了详细的地震稳定性分析。使用蒙特卡洛模拟方法计算安全值和失效概率。所有分析均使用Spencer方法在基于2D极限平衡的SLIDE软件中进行。内聚强度(c),摩擦角和地震加速度被认为是随机变量。在对上游和下游斜坡进行地震稳定性分析之后,创建了最终的斜坡几何形状。对于斜坡的关键几何形状,发现观察到的安全系数值高于ANCOLD中指定的值。发现失败概率值小于8%。新建的堆石坝已经经历了三季风降雨,并且仍然保持最佳状态。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号