...
首页> 外文期刊>International Journal of Electrical Power & Energy Systems >Power system restoration planning based on Wide Area Measurement System
【24h】

Power system restoration planning based on Wide Area Measurement System

机译:基于广域测量系统的电力系统恢复规划

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

This paper presents a method for the optimal restoration planning based on Wide Area Measurement System (WAMS). This method uses observability analysis and Power Transfer Distribution Factor (PTDF) concept. The PTDF concept is applied to decrease the overvoltages caused by energizing transmission lines with lightly load. The New England 39 bus power system is used to demonstrate the proposed algorithm and verify the results. The outcomes of the study are evaluated to show the validity and reliability of the presented approach.
机译:本文提出了一种基于广域测量系统(WAMS)的最佳修复计划方法。此方法使用可观察性分析和功率传输分配因子(PTDF)概念。 PTDF概念的应用是为了减少轻载时为传输线通电而引起的过电压。新英格兰39总线电源系统用于演示所提出的算法并验证结果。评估研究结果以显示所提出方法的有效性和可靠性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号