...
首页> 外文期刊>Generation, Transmission & Distribution, IET >Power system stability assessment during restoration based on a wide area measurement system
【24h】

Power system stability assessment during restoration based on a wide area measurement system

机译:基于广域测量系统的恢复期间的电力系统稳定性评估

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Online power system stability assessment during restoration has not been strongly addressed yet. The introduction of wide area measurement systems (WAMS), however, made it possible to monitor the stability online. This study technically presents a detailed analysis of stability during restoration using WAMS. The power system build-up strategy is used as the restoration approach, based on which the early and the last stages of restoration are to divide the power system into islands and interconnect them, respectively. In fact, the practical use of WAMS at the early stages of restoration provides precise determination of generators loading steps. Moreover, unification of phase angle references at different islands and presentation of tie line energising priority list are significant benefits of WAMS at the last stages of restoration. The New England 39-bus power system is used to demonstrate the proposed algorithm and verify the results. The proposed method is also applied on the IEEE 118-bus system as a large-scale power system to prove its capability in practical systems.
机译:恢复过程中的在线电力系统稳定性评估尚未得到强有力的解决。但是,广域测量系统(WAMS)的引入使在线监视稳定性成为可能。这项研究从技术上提出了使用WAMS进行恢复期间稳定性的详细分析。电力系统的建立策略被用作恢复方法,在该方法的基础上,恢复的早期和最后阶段分别将电力系统划分为多个岛并将它们互连。实际上,在恢复的早期阶段WAMS的实际使用可精确确定发电机的加载步骤。而且,在恢复的最后阶段,WAMS的显着优点是统一了不同岛上的相角参考,并显示了联络线激励优先级列表。新英格兰39总线电源系统用于演示所提出的算法并验证结果。所提出的方法还作为大型电力系统应用于IEEE 118总线系统,以证明其在实际系统中的能力。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号