...
首页> 外文期刊>International journal of electrical power and energy systems >Considering transient short-circuit currents of wind farms in overcurrent relays coordination using binary linear programming
【24h】

Considering transient short-circuit currents of wind farms in overcurrent relays coordination using binary linear programming

机译:考虑使用二进制线性规划的过电流过电场中风农场的瞬态短路电流

获取原文
获取原文并翻译 | 示例
           

摘要

The presence of wind farms in network makes short-circuit currents (SCC) seen by overcurrent relays (OCR) have not fixed magnitudes and contain transient states. The transient SCC changes real operating times of OCRs compared with calculated operating times, in addition to, mis-coordination between primary and backup OCRs. In this paper, a new method based on the dynamic model of OCR is proposed for considering the effects of transient SCCs of wind farms on the coordination of OCRs, and determining proper settings for them. Since the proposed optimization problem is highly complex and nonlinear, and also uses large amount of data, the intelligent optimization algorithms have not sufficient ability for utilizing in the proposed method. Therefore, the proposed coordination method is formulated as a binary linear programming (BLP)-based approach. It is also shown that the speed of proposed BLP-based method can be increased by removing some unusable variables. It is found from simulation results and hardware tests that the proposed method has better performance in comparison with conventional coordination methods.
机译:网络中的风电场的存在使过电流继电器(OCR)看到的短路电流(SCC)没有固定的大小并包含瞬态状态。除了主要和备份OCR之间的错误协调,瞬态SCC还会改变OCR的实际运行时间。在本文中,提出了一种基于OCR动态模型的新方法,用于考虑风电场瞬态SCC对OCRS协调的影响,并确定它们的正确设置。由于所提出的优化问题是高度复杂和非线性的,并且还使用大量数据,因此智能优化算法没有足够的利用方法来利用所提出的方法。因此,所提出的协调方法被配制为基于二进制线性编程(BLP)的方法。还示出了通过去除一些不可用的变量,可以增加所提出的基于BLP的方法的速度。从仿真结果和硬件测试中发现,与传统的协调方法相比,所提出的方法具有更好的性能。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号