首页> 外文期刊>International journal of design & nature and ecodynamics >OUTLET WORK OPTIMIZATION IN FLOOD CONTROL RESERVOIRS
【24h】

OUTLET WORK OPTIMIZATION IN FLOOD CONTROL RESERVOIRS

机译:防洪水库的出水口优化

获取原文
获取原文并翻译 | 示例
           

摘要

An examination of the general and hydrological planning criteria for artificial reservoirs clarifies the importance of choosing the correct type of outlet works both for stored volume management and for flooding events control. This choice becomes even more important, if we consider the effects of the climate change we have seen in recent years on extreme events. In this paper, the hydraulic operation of an extremely functional outlet work is studied using a physical model. The work is composed of an uncontrolled spillway and a mid-level outlet unified into a single structure. In particular, it proves of extreme interest both in the lamination of flood events and also in reducing the global costs of outlet works. The tests have highlighted the outstanding hydraulic operation of the works under any condition and, in particular, when the spillway flow and the mid-level outlet flow converge into a single duct.
机译:对人工水库的一般和水文规划标准的审查阐明了为存储量管理和洪水事件控制选择正确类型的出水口工程的重要性。如果考虑到近年来我们看到的气候变化对极端事件的影响,这一选择就变得更加重要。在本文中,使用物理模型研究了功能非常强大的出口工作的液压操作。该工程由一个不受控制的溢洪道和一个统一为单个结构的中层出水口组成。尤其是,它既对洪水事件的分层又对降低出口工程的全球成本产生了极大的兴趣。这些测试突出显示了在任何情况下,特别是当溢洪道水流和中层出口水流汇聚成一条管道时,该工程出色的液压操作性能。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号