...
首页> 外文期刊>International journal of computer mathematics >Real-time optimization of wind farms and fixed-head pumped-storage hydro-plants
【24h】

Real-time optimization of wind farms and fixed-head pumped-storage hydro-plants

机译:风电场和固定水头抽水蓄能电站的实时优化

获取原文
获取原文并翻译 | 示例
           

摘要

Renewable energies and, in particular, wind power have come to the forefront in the electricity market in recent years. The main drawback of wind power generation, however, is the major difficulty in forecasting its production. For this reason, when wind farms go to the market, they are very often made to pay penalties for the deviations between forecasting and actual production. In this paper we shall analyse whether real-time compensation of wind power plant deviation penalties is profitable by means of the coordinated optimization of the wind power plant with a large pumped-storage hydro-plant. We shall model the pumped storage plant in great detail and make use of optimal control techniques to carry out the optimization. We shall analyse the most relevant recent papers on the subject and compare them with our technique. We shall also analyse another possible solution based on compensation carried out a posteriori, instead of in real time.
机译:近年来,可再生能源,尤其是风能已在电力市场上走在前列。然而,风力发电的主要缺点是预测其发电量的主要困难。因此,当风电场进入市场时,往往会因预报与实际产量之间的差异而受到惩罚。在本文中,我们将通过协调优化大型抽水蓄能电站的风力发电厂,分析风力发电厂偏差补偿的实时补偿是否有利可图。我们将对抽水蓄能电站进行详细建模,并利用最佳控制技术进行优化。我们将分析有关该主题的最新文章,并将其与我们的技术进行比较。我们还将基于后验而不是实时的补偿来分析另一种可能的解决方案。

著录项

  • 来源
    《International journal of computer mathematics》 |2013年第10期|2147-2160|共14页
  • 作者单位

    E.P.I., Department of Mathematics, University of Oviedo, Campus of Viesques, Gijon 33203, Spain;

    E.P.I., Department of Mathematics, University of Oviedo, Campus of Viesques, Gijon 33203, Spain;

    E.P.I., Department of Mathematics, University of Oviedo, Campus of Viesques, Gijon 33203, Spain;

    E.P.I., Department of Mathematics, University of Oviedo, Campus of Viesques, Gijon 33203, Spain;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

    optimal control; pumped storage plant; wind farm;

    机译:最佳控制;抽水蓄能工厂;风电场;

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号