首页> 外文期刊>International journal of applied decision sciences >A novel earned value management model using Z-number
【24h】

A novel earned value management model using Z-number

机译:使用Z值的新型挣值管理模型

获取原文
获取原文并翻译 | 示例
       

摘要

The earned value management (EVM) model is an essential technique for managing and forecasting project features such as scheduling and cost performances indexes. This paper presents a novel fuzzy earned-value model based on Z-number theory incorporating both the impreciseness of real life conditions and a degree of reliability through considering an expert judgment process. The latter factor has not been used by other researchers in the field. The proposed model provides a reliable assessment for the progress performance of a project and its 'at completion' cost in an uncertain environment. Finally, an illustrative case demonstrates the applicability of the proposed model in real life projects.
机译:挣值管理(EVM)模型是用于管理和预测项目功能(如计划和成本绩效指标)的一项重要技术。本文通过考虑专家判断过程,提出了一种基于Z数理论的模糊挣值模型,该模型兼顾了现实生活条件的不精确性和可靠性。后一个因素尚未被该领域的其他研究人员使用。所提出的模型为不确定环境中项目的进度绩效及其“完成”成本提供了可靠的评估。最后,一个说明性案例说明了该模型在现实生活项目中的适用性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号