Major projects optimal capacity and timing with time-to-build and investment cost dependency on capacity

机译:主要项目最佳的能力和时机与建设和投资成本依赖的能力

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

This paper acknowledges the dependency of the project schedule, known also as the time-to-build, on the project capacity and proposes a real options model to determine the project optimal capacity, timing and value. In particular, we show that the dependency of the time-to-build on the capacity implies that the optimal capacity depends on the project time-to-build even in the waiting region. We also show that a greater sensitivity of the time-to-build to project capacity leads to a lower optimal capacity. Moreover, as the underperformance of major projects in terms of costs and schedule is frequent, we quantify the loss associated with the late completion of a major project. By doing so, we provide practitioners with a tool to evaluate the expected losses associated with project underperformance consistent with the reality of major projects.
机译:本文承认项目时间表的依赖性,也是在项目容量上作为构建时的依赖性,并提出了一个真实的选项模型来确定项目最佳容量,时间和值。特别地,我们表明,即使在等候区域中,最佳容量也取决于项目时间到建立的最佳容量。我们还表明,对项目能力的时间更大的灵敏度导致更低的最佳能力。此外,由于主要项目在成本和时间表方面的表现频繁,我们量化了与重大项目延迟完成相关的损失。通过这样做,我们为从业者提供了一个工具来评估与项目表现不佳的预期损失,这是与主要项目的现实一致。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号