...
首页> 外文期刊>The International Journal of Advanced Manufacturing Technology >Solving manpower scheduling problem in manufacturing using mixed-integer programming with a two-stage heuristic algorithm
【24h】

Solving manpower scheduling problem in manufacturing using mixed-integer programming with a two-stage heuristic algorithm

机译:混合整数规划与两阶段启发式算法解决制造中的人力调度问题

获取原文
获取原文并翻译 | 示例

摘要

Manpower scheduling problem is one of the key scheduling problems with extensive applications in manufacturing. This paper presents a mixed-integer programming model with a two-stage heuristic algorithm for solving the manpower scheduling problem in the precision engineering industry. Firstly, a mixed-integer programming formulation is developed to model the manpower scheduling problem in this high-mix low-volume manufacturing environment. Secondly, a two-stage heuristic algorithm is proposed where the first stage is deployed to calculate the skill requirements for each shift by considering the jobs, machines, and their production schedule and the second stage is designed to assign operators to the machines by considering the skill set requirements and the operator's expressed preferences. Lastly, the computational results based on problem instances emulating real-world scenarios demonstrated the feasibility and effectiveness of the proposed heuristic. Keywords Manpower scheduling problem - Heuristic - Mixed-integer programming model - Precision engineering
机译:人力调度问题是在制造业中广泛应用的关键调度问题之一。本文提出了一种具有两阶段启发式算法的混合整数规划模型,用于解决精密工程行业的人力调度问题。首先,开发了一种混合整数编程公式,以在这种高混合小批量制造环境中对人力调度问题进行建模。其次,提出了一种两阶段启发式算法,其中第一阶段被部署为通过考虑作业,机器及其生产计划来计算每个班次的技能要求,第二阶段被设计为通过考虑以下因素来分配操作员到机器技能要求和操作员表达的偏好。最后,基于问题实例模拟真实场景的计算结果证明了该启发式算法的可行性和有效性。关键词人力调度问题-启发式-混合整数规划模型-精密工程

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号