首页> 外文期刊>International environmental technology >AQE 2018 Busiest show in 15 years!
【24h】

AQE 2018 Busiest show in 15 years!

机译:AQE 2018 15年来最繁忙的表演!

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

2018 also saw AQE combine with its sister event WWEM (Water, Wastewater & Environmental Monitoring). With both events running in the same place, visitors with environmental responsibilities were able to pass freely between the two events and around 80% of visitors did so. The synergy that this created was a major factor in the 19% growth in visitor numbers at AQE 2018. The STA (Source Testing Association) Conference focused on the Medium Combustion Plant Directive (MCPD), which came into force on 20th December 2018. The MCPD applies to generators and plants between 1 and 50 MW (net rated thermal input) and an impact assessment has estimated that between 30,000 and 35,000 of these plants are currently operating in the UK alone. The estimated number of MCPs in the EU is around 143,000. From 20th December 2018 new UK plants need to be registered or have obtained a permit and comply with emission limit values (ELVs) for sulphur dioxide, oxides of nitrogen (NOx) and dust. The ELVs to be applied are dependent on plant, fuel type and size. Existing plants (i.e. those which were in operation before 20th December 2018) must be registered or have obtained a permit. They must comply with the requirements from 2024 or 2029, depending mostly on size, with the aim of full implementation by 2030. Covering all perspectives in the power generation sector, the MCPD Conference speakers included John Henderson, who leads on the implementation of the MCPD for the Environment Agency, David Graham from Uniper, Stewart Davies from Viridor, and the Combustion Engineers Association. The Environmental Industries Commission (EIC) seminar focused on solutions for the management and delivery of Clean Air Zones. Dan Williams from Johnson Matthey set the scene by describing the work of the EIC Air Quality Working Group, and this was followed by an update on feasibility studies, CAZ cost/benefit analysis and technology solutions from Guy Hitchcock, Knowledge Leader to CAZ for Ricardo Energy & Environment. Jim Mills from Air Monitors then described the measurement and reporting of air quality in CAZs, including the role of low cost sensor networks.
机译:2018年,AQE还与姊妹活动WWEM(水,废水和环境监测)相结合。两次活动都在同一地点进行,具有环保责任的访客可以在两次活动之间自由通行,大约80%的访客可以通过。这产生的协同作用是AQE 2018访客人数增长19%的主要因素。STA(源测试协会)会议的重点是中型燃烧工厂指令(MCPD),该指令于2018年12月20日生效。 MCPD适用于1到50兆瓦(净额定热输入)的发电机和发电厂,据影响评估估计,仅在英国,目前有30,000至35,000座发电厂正在运营。欧盟的MCP估计数量约为143,000。从2018年12月20日开始,新的英国工厂需要注册或获得许可,并遵守二氧化硫,氮氧化物(NOx)和粉尘的排放限值(ELV)。将要使用的ELV取决于工厂,燃料类型和大小。现有工厂(即在2018年12月20日之前运行的工厂)必须已注册或已获得许可。它们必须遵守2024或2029年的要求,主要取决于规模,目标是到2030年全面实施。MCPD会议的发言人包括John Henderson,他领导了MCPD的实施代表环境署,来自Uniper的David Graham,来自Viridor的Stewart Davies,以及燃烧工程师协会。环境工业委员会(EIC)研讨会的重点是清洁空气区的管理和交付解决方案。约翰逊·马修(Johnson Matthey)的丹·威廉姆斯(Dan Williams)通过描述EIC空气质量工作组的工作为背景,随后是里卡多能源(Ricardo Energy)的知识带头人盖伊·希区柯克(Guy Hitchcock)的可行性研究,CAZ成本/收益分析和技术解决方案的更新。 & 环境。然后,来自Air Monitors的Jim Mills描述了CAZ中空气质量的测量和报告,包括低成本传感器网络的作用。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号