...
首页> 外文期刊>International environment reporter >Brazil's BHP-Vale Mine, Crippled by Major Dam Spill, Said to Be in Restructure Talks
【24h】

Brazil's BHP-Vale Mine, Crippled by Major Dam Spill, Said to Be in Restructure Talks

机译:据称因大坝泄漏而瘫痪的巴西必和必拓谷矿正处于重组谈判中

获取原文
获取原文并翻译 | 示例
           

摘要

BHP Billiton Ltd. and Vale SA's Brazilian mining joint venture is exploring ways to restructure about $1.6 billion in loans months after a deadly accident halted output and crimped cash flow, people with knowledge of the matter said. Iron-ore miner Samarco hired JPMorgan Chase & Co. as it discusses restructuring debt with banks, three of the people said, asking not to be identified because the early-stage talks are private. BHP hired Rothschild & Co., Vale is getting advice from Moelis & Co., while the banks are working with FTI Consulting Inc., the people said.
机译:知情人士说,在一场致命的事故导致产量停滞和现金流减少后的几个月,必和必拓公司和淡水河谷巴西矿业合资公司正在探索重组约16亿美元贷款的方法。其中三名知情人士说,铁矿石开采商萨马科公司(Samarco)聘请摩根大通(JPMorgan Chase&Co.)讨论与银行进行债务重组的问题,由于前期谈判是私人谈判,因此要求匿名。知情人士说,必和必拓雇用罗斯柴尔德公司(Rothschild&Co。),Vale正在从Moelis&Co.获得建议,而银行正在与FTI Consulting Inc.合作。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号