...
首页> 外文期刊>International Dredging Review >Norfolk Dredging Completes Maintenance Dredging at Port of Baltimore
【24h】

Norfolk Dredging Completes Maintenance Dredging at Port of Baltimore

机译:诺福克疏浚在巴尔的摩港完成维修疏浚

获取原文
获取原文并翻译 | 示例
           

摘要

In April, Norfolk Dredging Company (NDC) finished dredging 2.6 million cubic yards from the shipping channels leading to the Port of Baltimore. The U.S. Army Corps of Engineers Baltimore District awarded the $24.6 million contract. Work began in December 2018 and was completed on April 14. The work is part of the regular maintenance of the multiple channels that go from the mouth of the Chesapeake Bay in Virginia into Baltimore Harbor. The current project dredged material from six federal channels.
机译:4月份,诺福克疏浚公司(NDC)从通往巴尔的摩港的航运渠道完成了260万立方码。 美国军队的工程师巴尔的摩区授予2460万美元的合同。 2018年12月开始工作,并于4月14日完成。该工作是经常维护弗吉尼亚州Chesapeake湾口中的多个渠道的经常维护的一部分。 目前项目从六个联邦渠道中疏浚物资。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号