【24h】

Expansive engineering

机译:扩展工程

获取原文
获取原文并翻译 | 示例
           

摘要

Getting a construction project off the ground often requires not only the falsework and formwork hardware, but also the expertise of the engineering team behind it, to offer contractors solutions to any ground-up problems. A case in point comes from UK-based RMD Kwikform, who were employed to help with a watery problem in Norway. With an increasing number of large cruise ships visiting the country, it was decided that an extension to the existing quay in the Andalsnes region was required. The main contractor on the project, Kristiseter AS, elected to connect the extension to the existing structure by means of a 60 m long, 4 m wide footbridge.
机译:开展建设项目通常不仅需要脚手架和模板硬件,还需要背后的工程团队的专业知识,才能为承包商解决任何地面问题。一个典型的例子是来自英国的RMD Kwikform,他受雇帮助挪威的水问题。随着越来越多的大型游轮访问该国,决定对安道尔尼斯地区的现有码头进行扩建。该项目的主要承包商Kristiseter AS选择通过60 m长,4 m宽的人行天桥将扩建部分连接到现有结构。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号