...
首页> 外文期刊>Inside FERC >Cal-ISO offers plan to use basis swaps as substitute price for generator fuel costs
【24h】

Cal-ISO offers plan to use basis swaps as substitute price for generator fuel costs

机译:Cal-ISO提供了使用基础掉期作为发电机燃料成本替代价格的计划

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

In a compliance filing earlier this month, California Independent System Operator floated the idea of using swaps to determine proxy gas costs for generators participating in the ISO markets.rnCal-ISO also proposed to use New York Mercantile Exchange basis swaps instead of data from IntercontinentalExchange "because NYMEX data are publicly available on the Internet," while a special contract would be needed to obtain data from ICE. "The ISO believes that the additional transparency associated with the NYMEX data makes it the better choice," said the compliance filing.rnFERC in February rejected a second request by Cal-ISO to use the Henry Hub natural gas delivery point in Louisiana as the projected proxy price for gas in determining caps on gas-fired generation start-up and minimum-load costs (IF, 2 March, 9).
机译:在本月初的合规文件中,加利福尼亚独立系统运营商提出了使用掉期确定参与ISO市场的发电机的代理天然气成本的想法。rnCal-ISO还建议使用纽约商品交易所基础掉期,而不是IntercontinentalExchange的数据。因为NYMEX数据可在Internet上公开获得,”,而从ICE获取数据则需要特殊合同。法规遵从文件说:“ ISO相信与NYMEX数据相关的额外透明度使其成为更好的选择。” rnFERC在2月份拒绝了Cal-ISO的第二项要求,即使用路易斯安那州的Henry Hub天然气输送点确定燃气发电启动和最低负荷成本上限的天然气代理价格(IF,3月2日,9)。

著录项

  • 来源
    《Inside FERC》 |2009年第13期|11-12|共2页
  • 作者

    Esther Whieldon;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号