首页> 外文期刊>Inside FERC >FERC signs off on Susquehanna West, rejects requests for hearing, consolidation of projects
【24h】

FERC signs off on Susquehanna West, rejects requests for hearing, consolidation of projects

机译:FERC在Susquehanna West上签字,拒绝听证会,合并项目的请求

获取原文
获取原文并翻译 | 示例
           

摘要

Tennessee Gas Pipeline won approval last week from FERC for arnproject meant to boost capacity on its 300 Line system in thernSusquehanna region of Pennsylvania by 145,000 Dt/d.rnThe $156.4 million Susquehanna West Project (CP15-48) wouldrnallow east-to-west firm incremental transportation service to StatoilrnNatural Gas. It entails about 8.2 miles of looping pipeline, additionalrncompression and piping modifications.
机译:田纳西州天然气管道公司(Tennessee Gas Pipeline)上周获得了FERC的arnproject批准,该项目旨在将宾夕法尼亚州萨斯奎汉纳地区的300 Line系统的产能提高145,000 Dt / d。rn 1.564亿美元的Susquehanna West项目(CP15-48)将会抑制东西向公司的增量Statoilrn天然气运输服务。它需要约8.2英里的管道循环,额外的压缩和管道改造。

著录项

  • 来源
    《Inside FERC》 |2016年第0912期|15-15|共1页
  • 作者

    Maya Weber;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号