首页> 外文期刊>Inside FERC >FERC issues mixed order on New York transmission right-of-first-refusal rules
【24h】

FERC issues mixed order on New York transmission right-of-first-refusal rules

机译:FERC在纽约传输的混合令第一拒绝拒绝拒绝规则

获取原文
获取原文并翻译 | 示例
           

摘要

The Federal Energy Regulatory Commission has granted in part and denied in part a petition from New York Independent System Operator regarding federal right of first refusal rules for power transmission projects. NYISO filed a petition for declaratory order that sought three things from the commission: 1. confirmation that New York transmission owners have a federal right of first refusal under NYISO’s foundational agreements to build, own, and recover the cost of upgrades to their existing transmission facilities, as permitted under FERC Order 1000; 2. confirmation that, if a transmission owner exercises its ROFR for upgrades to its existing transmission facilities, the owner should be treated under the existing tariff as a developer for the upgrade portion of the transmission project; and 3. clarification of the scope of the definition of “upgrade” under the open access transmission tariff.
机译:联邦能源监管委员会已批准并拒绝纽约独立制度运营商关于电力传输项目首次拒绝规则联邦权利的请愿。 Nyiso提出了一份宣言订单的请愿,这些订单从委员会中寻求三件事:1。确认纽约传输业主在Nyiso的基本协议下拥有联邦拒绝的联邦权利,该协议自行建设,并将其拥有,并恢复其现有传输设施的升级费用,允许在FERC订单1000下; 2.确认,如果传输所有者举办其rofr以升级其现有的传输设施,则所有者应根据现有的关税作为传输项目升级部分的开发人员处理; 3.澄清开放式访问传输关税下“升级”定义范围的范围。

著录项

  • 来源
    《Inside FERC》 |2021年第26期|11-12|共2页
  • 作者

    Jared Anderson;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号