...
首页> 外文期刊>Inside FERC >Power producers ask FERC to make MISO comply with capacity market rule
【24h】

Power producers ask FERC to make MISO comply with capacity market rule

机译:电力生产商要求FERC使MISO符合容量市场规则

获取原文
获取原文并翻译 | 示例
           

摘要

A group of power producers on Monday asked the Federal EnergyRegulatory Commission to order the Midcontinent Independent SystemOperator to abide by its own rule requiring all capacity resourcescounted in the planning reserve margin requirement to be “fullydeliverable,” before the next Planning Resource Auction.“The seriousness of this issue is evident in the historically low[capacity] reserve margins that MISO is experiencing,” said thecomplaint filed by the Coalition of Midwest Power Producers (EL19-28).“Requiring compliance with the Tariff for the upcoming PRA (as well asall auctions) is essential both to maintaining reliability and to ensuringrates are just and reasonable, and not unduly discriminatory.”COMPP encompasses Vistra Energy, Main Line Generation andMidland Cogeneration Venture Limited Partnership.
机译:一组电力生产商周一要求联邦能源 r n监管委员会命令中部独立系统 r n运营商遵守其自己的规则,要求规划储备保证金要求中所有容量资源“必须完全” r n可交付使用,”在下一次计划资源拍卖之前。 r n“此问题的严重性在MISO经历的历史上较低的 r n [容量]储备余量中很明显,” r n投诉 r n“对于即将到来的PRA(以及 r nall拍卖)要求遵守电价对保持可靠性和确保 r r nCOMPP包括Vistra Energy,Main Line Generation和 r nMidland Cogeneration Venture Limited Partnership。

著录项

  • 来源
    《Inside FERC》 |2019年第7期|15-15|共1页
  • 作者

    Mark Watson;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号