首页> 外文期刊>Innovative Infrastructure Solutions >A process improvement methodology for effective implementation of value stream mapping integrated with foreman delay survey
【24h】

A process improvement methodology for effective implementation of value stream mapping integrated with foreman delay survey

机译:有效实施价值流映射的过程改进方法,与工头延迟调查集成

获取原文
获取原文并翻译 | 示例
           

摘要

Construction wastes, whether product or process, have escalated drastically in Indian construction context and have unfortunately become inevitable. To overcome a lot of inefficiencies in the traditional system, lean concepts have been introduced. Lean construction method is considered as the fundamental principle in identifying and minimizing the various wastes involved in the construction, yet faces challenges in implementation. This study aims to assess the process improvement methodology developed for value stream mapping. The aim also extends to further determine its applicability and develop the utilization of VSM as a prominent lean tool in the Indian construction industry. In addition, foreman delay survey helped to broadly identify the hidden wastes in order to get better insights for this research. With the involvement of industry practitioners in our study, it proved in an increase of 25% in the productivity. The paper successfully managed to build a better workflow and information-flow reliability, which helped reduce non-value added time by a significant amount.
机译:建筑废物,无论是产品还是过程,都在印度建设背景下大幅升级,不幸的是不可避免。为了克服传统系统的许多效率低下,已经介绍了精益的概念。精益施工方法被认为是识别和最小化建设中涉及的各种废物的基本原则,但面临实施的挑战。本研究旨在评估为价值流映射开发的过程改进方法。目的还延伸,进一步确定其适用性,并在印度建筑行业中发展了VSM作为一个突出的精益工具的利用。此外,工头延迟调查有助于广泛识别隐藏的废物,以便为这项研究提供更好的见解。随着行业从业者参与我们的研究,它证明的生产率增加了25%。本文成功地设法建立了更好的工作流程和信息流可靠性,这有助于减少数量的非增值时间。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号