Distributors are still waiting for construction projects funded by the most recent economic stimulus package to begin, and they say it can't come soon enough.rn"This is the slowest drip of funding I have ever seen," says HD Supply president and CEO Joe DeAngelo. "It hasn't been a significant factor in the markets at all in terms of driving up demand. However, I think we're well positioned to win projects when the flow starts coming. ... When it comes, it's going to be great. There are good projects out there."
展开▼
机译:分销商仍在等待由最新经济刺激计划资助的建筑项目开始,他们说这还不能很快到位。rn“这是我见过的最慢的资金流,” HD Supply总裁兼首席执行官说乔·迪安杰洛(Joe DeAngelo)。 “就拉动需求而言,这根本不是市场上的重要因素。但是,我认为,当资金流开始来临时,我们已经做好了赢得项目的准备。……到时候,它将成为太好了。那里有好项目。”
展开▼