首页> 外文期刊>Indian Railways >Muzaffarpur-Sagauli & Sagauli-Valmiki Nagar Lines Doubling with Electrification
【24h】

Muzaffarpur-Sagauli & Sagauli-Valmiki Nagar Lines Doubling with Electrification

机译:Muzaffarpur-Sagauli和Sagauli-Valmiki Nagar线路充满电

获取原文
获取原文并翻译 | 示例
           

摘要

The Cabinet Committee on Economic Affairs, chaired by Prime Minister Shri Narendra Modi has approved the 100.6 km long Muzaffarpur-Sagauli & 109.7 km Sagauli-Valmiki Nagar lines Doubling projects with electrification at completion costs of ? 1347.61 crore, ^1381.49 crore respectively. These projects will cover the districts of Muzaffarpur, East Champaran (Motihari) and West Champaran (Bettiah) in Bihar. Areas served by this route are densely population regions of north Bihar. At present passenger trains suffer congestion and stoppages on Muzaffarpur to Valmiki Nagar route as the line capacity utilization is upto 213%. 38 mail/express trains are running in this section with thousands of passengers travelling daily. Additional capacity will ease congestion and allow faster and reliable movement with minimum delays. In addition, it will enhance safety through more availability of maintenance blocks.
机译:由总理什里·纳伦德拉·莫迪(Shri Narendra Modi)担任主席的内阁经济事务委员会已批准了100.6公里长的穆扎法尔布尔·萨古里(Muzaffarpur-Sagauli)和109.7公里的萨古里·瓦尔米基·纳加尔(Sagauli-Valmiki Nagar)线路加倍电气化项目,完工成本为?分别为1347.61千万和1381.49千万。这些项目将覆盖比哈尔邦的穆扎法尔布尔,东尚帕兰(Motihari)和西尚帕兰(Bettiah)地区。该路线所服务的地区是比哈尔邦北部的人口稠密地区。目前,由于线容量利用率高达213%,因此在穆扎法尔布尔到Valmiki Nagar路线上,旅客列车出现拥堵和停车。这部分运行着38列邮件/特快列车,每天有成千上万的乘客旅行。额外的容量将缓解拥塞,并以最小的延迟实现更快,更可靠的移动。此外,它将通过增加维护模块的可用性来提高安全性。

著录项

  • 来源
    《Indian Railways》 |2018年第4期|36-36|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号