首页> 外文期刊>Indian Railways >Construction of Underground Box Tunnel below VIP Road to Airport (Gate No. 1)
【24h】

Construction of Underground Box Tunnel below VIP Road to Airport (Gate No. 1)

机译:贵宾箱隧道施工到vip路到机场(门号1号门)

获取原文
获取原文并翻译 | 示例
       

摘要

The construction works on Noapara to Bimanbandar stretch of Noapara-Barasat Metro extension project have been going on in full swing amidst COVID-19 lockdown. On this 7.036 km stretch, the work of RCC underground box tunnel below VIP Road to Airport (Gate No.1) is presently going on. For successful execution of this very important work, this road was required to be diverted. This road diversion work was accomplished on 21.08.2020-22.08.2020 night with the help of steel barricading and road blinker. This diversion will facilitate smooth execution of the tunneling work without hampering vehicular movement during night on VIP Road. This RCC box tunneling work is expected to be over within next two months. All possible safety precautions have been ensured during the diversion work.
机译:Noapara的建筑工程到Bimanbandar延伸的Noapara-Barasat地铁扩展项目在Covid-19锁定中一直在全面进行。在7.036 km拉伸,RCC地下箱隧道的工作目前正在进行vip路面以下的vip路径(门1号)。为了成功执行这一非常重要的工作,需要这种道路被转移。这项道路转移工作是在21.08.2020-22.08.2020夜之前完成的,钢铁路障和道路眨眼之间。这种转移将促进隧道工作的顺利执行,而不会在vip路上夜间妨碍车辆运动。该RCC箱隧道工作预计将在未来两个月内抵达。在转移工作期间已经确保了所有可能的安全预防措施。

著录项

  • 来源
    《Indian Railways》 |2020年第7期|41-41|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 21:55:57

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号