首页> 外文期刊>Indian Railways >Commendable Step for Automation Work of Platform Lighting by West Central Railway
【24h】

Commendable Step for Automation Work of Platform Lighting by West Central Railway

机译:西部铁路平台照明自动化工作的值得称道的步骤

获取原文
获取原文并翻译 | 示例
           

摘要

West Central Railway has always been ready and leading for the conservation of electrical energy. Under the directions of General Manager Shri Shailendra Kumar Singh, effective steps have been taken for energy conservation by the electrical department for controlling the platform lights in West Central Railway. In this regard, the automatic platform light control system based on the signal system in the platform number 1 of Jabalpur and platform number 1 and 2 of Narsingpur stations has been installed on 04.07.2020 in Jabalpur division.
机译:西部中央铁路一直准备好并领导电能保护。在Shri ShaIsendra Kumar Singh总体经理的指示下,有效的步骤是通过电气部门控制西部铁路平台灯的能量育。在这方面,在Jabalpur划分的04.07.2020上安装了基于Jabalpur的平台1和2和2的平台1和2的信号系统中的自动平台光控制系统。

著录项

  • 来源
    《Indian Railways》 |2020年第6期|56-57|共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号