首页> 外文期刊>Indian journal of power and river valley development >Assessing the impact of Karnataka Electricity Regulatory Commission's open access order for solar power generators in Karnataka
【24h】

Assessing the impact of Karnataka Electricity Regulatory Commission's open access order for solar power generators in Karnataka

机译:评估卡纳塔克邦电力监管委员会对卡纳塔克邦太阳能发电机的开放访问令的影响

获取原文
获取原文并翻译 | 示例
           

摘要

On 18 August 2014, the Karnataka Electricity Regulatory Commission (KERC) passed order number S/03/01 called 'Wheeling Charges, Banking Charges & Cross Subsidy Surcharge for Solar Power Generators', whereby all solar power generators in the state who achieved Commercial Operation Date (COD) before 31 March 2018 were exempted from payment of wheeling and banking charges and cross subsidy surcharge for a period of ten years from the date of commissioning. This landmark order provided long term clarity for solar project developers and consumers. For certain categories of consumers (commercial), the exemption meant that solar energy became more viable while planning their energy mix. From KERC s perspective, the main drivers for passing this order was the low rate of growth of solar energy installations in Karnataka and the prevalent trend of a reducing solar tariff seen against rising utility tariffs. The Commission hoped that this measure would facilitate greater and rapid growth of solar energy through third party open access and captive routes. Given the importance of this order, WRI is keen to track its on-ground impact to serve as a feedback mechanism to KERC and as a learning for other state regulators who may be looking for solutions to increase the quantum of solar energy in their states.
机译:2014年8月18日,卡纳塔克邦电力管理委员会(KERC)通过了编号为S / 03/01的订单,名为“太阳能发电机的轮转费,银行手续费和交叉补贴附加费”,该州所有实现商业运营的太阳能发电机自启用之日起十年内,免除2018年3月31日之前的日期(COD)的车辆和银行费用以及交叉补贴附加费。这一具有里程碑意义的订单为太阳能项目开发商和消费者提供了长期清晰的信息。对于某些类别的消费者(商业),豁免意味着在计划其能源结构时太阳能变得更加可行。从KERC的角度来看,通过该命令的主要驱动力是卡纳塔克邦太阳能装置的低增长率,以及相对于公用事业价格上涨而言降低太阳能关税的普遍趋势。委员会希望这项措施将通过第三方开放获取和专属路线促进太阳能的更大,更快的增长。鉴于该命令的重要性,WRI渴望跟踪其对地面的影响,以作为KERC的反馈机制,并为其他可能寻求解决方案以增加本州太阳能量的州监管机构提供借鉴。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号