首页> 外文期刊>The Indian concrete journal >An assessment of the progressive failure of concrete using pulse velocity measurements
【24h】

An assessment of the progressive failure of concrete using pulse velocity measurements

机译:使用脉冲速度测量评估混凝土的渐进破坏

获取原文
获取原文并翻译 | 示例
       

摘要

The experimental findings of the ultrasonic pulse velocity (UPV) test on concrete cubes during progressive compressive loading are reported in this paper. The concrete cubes were prepared with two types of cement, namely, ordinary portland cement (grade 43) and portland slag cement and tested in progressive compression till failure, during which the pulse velocity was recorded at each increment of the load. The development of strength with age during curing was also monitored by measuring the pulse velocity. The pulse velocity measurements during the progressive loading revealed that the pulse velocity increases slightly during the initial stage of compression. Thereafter, the pulse velocity decreases due to the development of micro-cracks. It was also observed that cracking starts earlier for the higher strength concrete (low water-cement ratio), than the lower strength (higher water-cement ratio) concrete. This was evident from the decrease of pulse velocity earlier during the progressive compression testing. Abrupt reduction in pulse velocity occurred at 75-85 percent of the failure load. These facts demonstrate the usefulness of the UPV test for anticipating failure in concrete structures.
机译:本文报道了渐进压缩荷载作用下混凝土立方体的超声脉冲速度(UPV)试验的实验结果。用两种类型的水泥制备混凝土立方体,即普通硅酸盐水泥(43级)和硅酸盐矿渣水泥,并进行渐进压缩试验直至破坏,在此过程中,在每次载荷增加时记录脉冲速度。还通过测量脉冲速度来监测固化过程中强度随年龄的增长。渐进加载过程中的脉冲速度测量表明,在压缩的初始阶段,脉冲速度略有增加。此后,由于微裂纹的发展,脉冲速度降低。还观察到,高强度混凝土(低水灰比)的开裂比低强度(高水灰比)的开裂更早。从渐进压缩测试中较早的脉冲速度降低可以明显看出这一点。在故障负载的75%至85%处,脉冲速度突然降低。这些事实表明,UPV测试可用于预测混凝土结构的失效。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号