...
首页> 外文期刊>The Indian concrete journal >A PROACTIVE TIME TO FIRST REPAIR FOR COASTAL RC BRIDGE WITH PRESCRIPTIVE DURABILITY PROVISIONS
【24h】

A PROACTIVE TIME TO FIRST REPAIR FOR COASTAL RC BRIDGE WITH PRESCRIPTIVE DURABILITY PROVISIONS

机译:具有规定耐用性规定的沿海RC桥修复的主动时间

获取原文
获取原文并翻译 | 示例

摘要

Prescriptive durability provisions have been used worldwide for designing concrete structures. Such structures are found to have deteriorated prematurely (unpredicted and suddenly), requiring expensive repairs. In this paper a probabilistic life-cycle deterioration analysis is performed for an upcoming coastal reinforced concrete bridge in India to proactively estimate the time of its first repair. This information is of utmost importance, particularly to support bridge managers defining the budget allocations for maintenance scenarios. This analysis also highlights the inadequacy of the current prescriptive provisions and the importance of adopting the probabilistic durability design for new infrastructures in the future.
机译:规定的耐用性规定已用于设计混凝土结构。 发现这种结构过早地劣化(不受预测和突然),需要昂贵的维修。 本文在印度即将到来的沿海钢筋混凝土桥进行了概率的生命周期恶化分析,以积极估计其首次修复的时间。 此信息至关重要,特别是支持定义维护方案的预算分配的桥梁管理器。 该分析还突出了目前规范性规定的不足,以及将来采用新基础设施采用概率耐用性设计的重要性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号