首页> 外文期刊>電子情報通信学会技術研究報告 >協調知識情報を考慮したヮィブル分布の階層べィズモデルと計算推論に基づくソフトゥエァの信頼性解析
【24h】

協調知識情報を考慮したヮィブル分布の階層べィズモデルと計算推論に基づくソフトゥエァの信頼性解析

机译:基于协同知识信息的可计算分布和计算推理分层Baze模型的软件可靠性分析

获取原文
获取原文并翻译 | 示例
       

摘要

Software debugging processes are effective due to products managing based on evaluations of reliability. The reliability is defined as the value with dependence on remaining errors. However, the errors are not observed in a debugging process, and then we need to estimate the reliability based on dynamical methods. In this paper, a dynamical modeling method for interval time between debugs is proposed. The Weibull distribution is used for the hierarchical model, and the gamma distributions are used for the scale and shape parameters. In particular, common knowledge opinions are proposed to install the hypeparameters. Bayesian computational inferences are used for the hierarchical model. The information criterion EIC is applied to the Bayesian methodologies, and the model and priors fitted to a set of data are chosen.%ソフトウエアの信頼性は残存するバグの個数に依存した評価として定義されるが,ソフトウェア内のバグの個数は未知であることから,デバグ過程に着目した動的な信頼性解析モデルが必要とされる.本報告では,動的モデルに着目しデバグの時間間隔をデータとして扱う.ここでは,ワイブル分布に階層構造を構成し,事前分布としてガンマ分布を用いる.特に,ワイブル分布の形状パラメータにもガンマ分布による事前分布を想定することで,デバグ過程における協調知識を解析に取り入れる方法を構成する.また,ペイズ計算推論を用いることでパラメータの値をデータから求める.さらに,モデルの比較を行うための統一的なモデル選択として情報量規準の適用を提案する.
机译:由于产品管理基于可靠性评估,因此软件调试过程是有效的。可靠性定义为依赖于剩余错误的值,但是在调试过程中未观察到错误,因此我们需要根据本文提出了一种用于调试之间间隔时间的动态建模方法,将Weibull分布用于层次模型,将gamma分布用于尺度和形状参数,特别是提出常识性意见将贝叶斯计算推论用于层次模型。将信息标准EIC应用于贝叶斯方法,并选择适合一组数据的模型和先验。%软件可靠性仍然是一个错误。但是,由于软件中的错误数量未知,因此需要一个专注于调试过程的动态可靠性分析模型。我们通过集中精力将调试的时间间隔视为数据,这里,在Weibull分布中构造了层次结构,并且将gamma分布用作先验分布。假设基于形状参数的伽玛分布的先验分布,我们构建了一种将调试过程中的协作知识纳入分析的方法,并使用“暂停”计算推断从数据中获取参数的值。我们建议将信息标准作为进行比较的统一模型选择。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号