Pressurized Fluidized Bed Combustion of Coal for Electric Power Generation The AEP Approach

机译:煤的加压流化床燃烧用于发电AEP方法

获取原文
获取原文并翻译 | 示例
           

摘要

American Electric Power (AEP), STAL-LAVAL Turbine A.B. (SL), and Deutsche Babcock Anlagen AG (DBA) are working on a program estimated to cost $250 million that will lead toward the construction of a large (170,000 KW) commercial demonstration of an advanced electric power plant incorporating Pressurized Fluidized Bed Combustion (PFBC) of coal. A pilot plant test program carried out during 1977-1980 verified combustor performance and demonstrated long gas turbine blade life. Parallel efforts during this period involved the design of the 170,000 kW Commercial Demonstration Plant (CDP) and a 500,000 kW Commercial Plant which essentially consists of two CDP combustors???gas turbine modules and a larger capacity steam cycle. These efforts showed considerable economic advantages of PFBC???combined cycle power generation over other alternative technologies. A 15,000 KW (thermal) component test facility (CTF) is presently under construction in Sweden. Extensive testing is scheduled to begin in early 1982. Upon successful completion of these tests, AEP intends to start construction of the CDP in 1983; the plant is expected to supply power to the AEP network by 1986.
机译:美国电力(AEP),STAL-LAVAL涡轮A.B. (SL)和Deutsche Babcock Anlagen AG(DBA)正在进行一项计划,估计耗资2.5亿美元,该计划将导致大型(170,000 KW)商业示范项目的建设,该工厂将采用加压流化床燃烧(PFBC) )煤。 1977-1980年间进行的工厂试点试验计划验证了燃烧室的性能,并证明了燃气轮机叶片的使用寿命长。在此期间的并行工作涉及设计170,000 kW商业示范工厂(CDP)和500,000 kW商业工厂,该工厂主要由两个CDP燃烧器组成–燃气轮机模块和更大容量的蒸汽循环。这些努力显示了PFBC联合循环发电相比其他替代技术的可观的经济优势。瑞典目前正在建设15,000 KW(热)组件测试设备(CTF)。广泛的测试计划于1982年初开始。在成功完成这些测试后,AEP计划于1983年开始CDP的建设。该工厂有望在1986年之前为AEP网络供电。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号