首页> 外文期刊>IEEE Journal on Selected Areas in Communications >A route optimization algorithm and its application to mobilelocation management in ATM networks
【24h】

A route optimization algorithm and its application to mobilelocation management in ATM networks

机译:路由优化算法及其在ATM网络中移动定位管理中的应用

获取原文
获取原文并翻译 | 示例
       

摘要

In this paper, we propose an algorithm for optimizing the route ofna connection that becomes suboptimal due to operations such as handoffsnand location-based reroutes, for mobile ATM (asynchronous transfer mode)nnetworks based on the PNNI (private network-to-network interface)nstandard. This algorithm uses hierarchical route information of thenconnection and summarized topology and loading information of thennetwork to determine a “crossover node” such that adjustingnthe connection from that crossover node results in an optimally routednconnection. We then apply this algorithm to the mobile locationnmanagement problem. Location management schemes have been proposed innwhich an incoming call to a mobile is first routed to its home switchn(based on summarized reachability data) and then rerouted to thenmobile's current location. If we consider such rerouting a “firstnphase” of mobile connection setup, a “second phase” isnrequired to optimize the paths of such rerouted connections. Such annapproach is considered a two-phase mobile location/connection setupnscheme. Alternatively, an incoming call to a mobile can be first routednto its home switch based on summarized reachability data, and thenn“cranked back” to an optimal crossover node before reroutingnthe connection to the mobile's current location. Such a scheme is anone-phase mobile location/connection setup scheme since it directlynresults in an optimal path. A comparative performance analysis of thenone- and two-phase connection setup schemes is presented. Measures ofncomparison are call setup delay and the amount of network resourcesnallocated to a connection. The maximum call setup delay (worst case callnsetup delay) is lower in the two-phase scheme, but the average callnsetup delay is lower in the one-phase scheme. The amount of resourcesnrequired for a connection in the two-phase scheme (prior to routenoptimization) is significantly greater than that in the one-phase scheme
机译:在本文中,我们针对基于PNNI(专用网络到网络接口)的移动ATM(异步传输模式)n网络,提出了一种优化由于连接切换和基于位置的重路由等操作而导致次优连接的路由的算法。非标准。该算法使用“连接”的分层路由信息以及“网络”的摘要拓扑和负载信息来确定“跨接节点”,以便从该跨接节点调整连接可产生最佳的路由连接。然后,我们将此算法应用于移动位置管理问题。已经提出了位置管理方案,其中,到移动站的呼入首先被路由到其归属交换机(基于汇总的可达性数据),然后被重新路由到移动站的当前位置。如果我们考虑将这种重新路由选择设置为移动连接设置的“第一阶段”,则需要“第二阶段”来优化此类重新路由的连接的路径。这样的安那方法被认为是两阶段的移动位置/连接建立方案。备选地,可以首先基于汇总的可达性数据将到移动台的呼入路由到其归属交换机,然后在重新路由到该移动台的当前位置之前将其“调回”到最佳交叉节点。这样的方案是单相移动位置/连接建立方案,因为它直接导致最优路径。提出了单相和两相连接建立方案的比较性能分析。比较的指标是呼叫建立延迟和分配给连接的网络资源量。在两阶段方案中,最大呼叫建立延迟(最坏的情况是callnsetup延迟)较低,但是在单阶段方案中,平均callnsetup延迟较低。在两阶段方案中(路由优化之前),连接所需的资源量明显大于一阶段方案中的资源量

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号