首页> 外文期刊>IBM Journal of Research and Development >System Recovery Boost on IBM z15
【24h】

System Recovery Boost on IBM z15

机译:IBM Z15上的系统恢复提升

获取原文
获取原文并翻译 | 示例
           

摘要

System Recovery Boost on the IBM z15 server expedites planned operating system shutdown, either planned or unplanned operating system initial program load (IPL), middleware and workload restart and recovery, and the client workload execution that follows, to accelerate service restoration around downtime. It does this by providing limited-duration “boost periods” that deliver significant usable additional processor capacity and parallelism. On subcapacity machine models, it provides a boost in processor speed by running the general-purpose processors at full-capacity speed, for the boosting LPARs only, and only during the boost periods. It makes all available processing capacity defined to the boosting images available to process any kind of work, “blurring” general-purpose processor and specialty processor capacity together during the boost period. System Recovery Boost also expedites and parallelizes processor reconfiguration actions that may be part of the client's overall restart and recovery process, as orchestrated by Geographically Dispersed Parallel Sysplex (GDPS) automation. Optionally, System Recovery Boost provides the ability to add additional processor capacity from the client's unused “dark cores” via activation of a new type of temporary capacity record. All of this can be accomplished without increasing the client's IBM software billing costs or the processor consumption associated with the client's workload during these boost periods.
机译:System Recovery Boost在IBM Z15服务器上加快计划操作系统关闭,规划或计划计划的操作系统初始程序负载(IPL),中间件和工作负载重新启动和恢复,以及遵循的客户端工作负载执行,以加速停机服务恢复。它通过提供有限持续时间“升压期”来实现这一点,可以提供显着的可用额外的处理器容量和并行性。在子步进度机器型号上,它通过以全容量速度运行通用处理器,仅为升压LPAR提供促进的LPAR,提供了处理器速度的提升,仅在升压期间。它使所有可用的处理能力定义为可用于处理任何类型的工作,在提升期间将任何类型的工作,“模糊”通用处理器和专业处理器容量一起使用。系统恢复增强也加快了可以成为客户端的整体重启和恢复过程的一部分的处理器重新配置操作,并通过地理分散的并行Sysplex(GDPS)自动化来协调。可选地,系统恢复增强能够通过激活新类型的临时容量记录来提供从客户未使用的“暗核心”中添加其他处理器容量的能力。所有这一切都可以在不增加客户端的IBM软件计费成本或在这些升压期间与客户端工作负载相关联的处理器消耗。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号