The following hydraulic entities have been constructed in the northern climatic zone of Russia: the Vilyui- 1 and -2 hydroelectric plants, and the Khantaika, Kura, and Kolyma hydroelectric plants. Construction of the Vilyui-3 hydroelectric plant (1980) and Ust'-Srenekan hydroelectric plant (1989) was initiated prior to the start of Reconstruction and reform, and is continuing. Construction of the series of Tolmacheva hydroelectric plants was Begun in connection with the acute fuel-energy crisis in Kamchatka.
机译:在俄罗斯北部气候带中,建造了以下水力实体:Vilyui-1和-2水力发电厂以及Khantaika,Kura和Kolyma水力发电厂。 Vilyui-3水力发电厂(1980)和Ust'-Srenekan水力发电厂(1989)的建设在重建和改革开始之前就已经开始,并且仍在继续。与堪察加半岛严重的燃料-能源危机有关,开始建造托尔马切瓦水电站系列。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号