首页> 外文期刊>Hydro review >Using a Grapple to Remove Woody Debris in Front of Turbine Intakes
【24h】

Using a Grapple to Remove Woody Debris in Front of Turbine Intakes

机译:使用抓斗去除涡轮进气口前的木屑

获取原文
获取原文并翻译 | 示例
           

摘要

Buildup of woody debris on the trash-racks at the 44-MW Yates and 78-MW Thurlow plants on the Tallapoosa River in Alabama blocked as much as 25 percent of the turbine intakes. Removal of this debris restricted plant operations, took much time, and was costly. To make the process simpler and less expensive, project owner Alabama Power Company installed a hydrauli-cally operated grapple on the existing gantry crane. This grapple can be operated by plant personnel and requires less time than the old method.
机译:在阿拉巴马州塔拉波萨河上44兆瓦的耶茨和78兆瓦的瑟洛电厂的垃圾架上堆积木屑,堵塞了涡轮机进水口的25%。清除这些碎屑限制了工厂的运转,花费了很多时间,而且成本很高。为了简化过程并降低成本,项目所有者阿拉巴马州电力公司在现有的龙门起重机上安装了液压液压抓斗。这种抓斗可以由工厂人员操作,并且比旧方法需要的时间更少。

著录项

  • 来源
    《Hydro review》 |2006年第6期|p.60-61|共2页
  • 作者

    William L. Bryan;

  • 作者单位

    Alabama Power Company, 249 Outer Drive, Tallahassee, AL 36078;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 发电、发电厂;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号