During a recent rehabilitation effort, Tacoma Power replaced the automation systems at its two-powerhouse 114-MW Nisqually project. As a result of this work, Tacoma Power cut unit start-stop times in half, eliminated 24-hour on-site operators, and established a process to store and trend plant data. Designing and installing the automation system in-house let Tacoma Power maintain control of the technology and ensure the system met all its requirements.
机译:在最近的修复工作中,塔科马电力公司(Tacoma Power)在其两发电站114兆瓦Nisqually项目中更换了自动化系统。这项工作的结果是,塔科马动力公司将机组的起停时间缩短了一半,消除了24小时的现场操作员,并建立了存储和趋势化工厂数据的流程。内部设计和安装自动化系统可以让Tacoma Power保持对技术的控制,并确保系统满足其所有要求。