首页> 外文OA文献 >Evaluation of hydropower upgrade projects - a real options approach
【2h】

Evaluation of hydropower upgrade projects - a real options approach

机译:评估水电升级项目 - 一种实物期权方法

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

When evaluating whether to refurbish existing hydropower plants or invest in a new power plant, there are two important aspects to take into consideration. These are the capacity chosen for the production facilities and the timing of the investment. This paper presents an investment decision support framework for hydropower producers with production facilities due for restoration. The producer can choose between refurbishing existing power plants and investing in a new production facility. A real options framework is proposed to support the investment decision. Using a case from Norsk Hydro ASA, a Norwegian hydropower producer, we employ the framework to evaluate the investment opportunities. Our main contribution is an approach that combines hydropower scheduling and real options valuation, and the results from our analysis suggest feasible investment strategies for Norsk Hydro ASA.
机译:在评估是翻新现有水力发电厂还是投资新的发电厂时,需要考虑两个重要方面。这些是为生产设施选择的产能和投资时间。本文提出了针对具有恢复生产设施的水电生产商的投资决策支持框架。生产商可以在翻新现有发电厂和投资新的生产设施之间进行选择。提出了一个实物期权框架来支持投资决策。以挪威水电生产商Norsk Hydro ASA的案例为例,我们使用该框架评估投资机会。我们的主要贡献是将水电调度与实物期权评估相结合的方法,我们的分析结果为Norsk Hydro ASA提出了可行的投资策略。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
代理获取

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号